 I’ve reviewed NetSuite across its full platform: accounting, CRM, eCommerce, payroll, inventory management, project management, and supply chain — and it’s the most complete all-in-one ERP that I’ve tested for mid-market businesses. It works especially well for companies that need a single system in which financials, operations, and customer data stay automatically connected, without manual exports or patchwork integrations. Pricing is custom and implementation requires real commitment, so it’s not built for really small businesses. But if you’ve outgrown QuickBooks or Xero, NetSuite is the natural next step.

Netsuite's accounting software improves financial controls, produces accurate reports, and simplifies the recording of payment transactions. Gain real-time insights into financial metrics and ensure accounting regulations, all on their app or desktop.

Plans & Pricing

3.0

NetSuite Limited

Custom Pricing

seat/

month

Get Started

NetSuite Mid-Market

Custom Pricing

seat/

month

Get Started

Netsuite Enterprise

Custom Pricing

seat/

month

Get Started

* Featured prices can be updated and free offers may include additional terms.

I researched the NetSuite pricing and found that they offer customized packages.  There are three main plans that all have their own core functionalities, and plans are customized to specific business needs.

NetSuite offers free product tours to help you decide if the application is right for you.

Is NetSuite Worth It for Growing Businesses in 2026?

During my testing, NetSuite delivered solid results across every module I evaluated. For mid-market and enterprise teams, yes — but it’s not the right fit for everyone. Here’s how each area performs:

  • ERP & Accounting: NetSuite replaces disconnected finance tools with a unified general ledger, AP/AR automation, revenue recognition, and multi-entity consolidation. I found it handles the kind of financial complexity that QuickBooks simply can’t.
  • CRM: Full sales pipeline, marketing automation, partner management, and CPQ — all tied to the same customer record as your financials and inventory. No data silos.
  • Ecommerce & Website Builder (SuiteCommerce): Integrated storefront with 190+ currency support, cart abandonment recovery, and SEO controls. I tested it for both B2B and B2C scenarios, and it holds up well for businesses running commerce alongside operations.
  • Online Invoicing & Bookkeeping: Automated billing schedules, subscription billing with proration, and a general ledger that stays in sync with everything else. No need to re-enter data across systems.
  • Payroll (SuitePeople): Multi-state payroll, direct deposit, employee self-service, and compliance tools. Best when payroll needs to talk directly to HR and finance, which it does here.
  • Project Management: Gantt charts, real-time task tracking, budget vs. actuals, and milestone billing. Particularly useful for service businesses that bill clients by project.
  • Inventory Management & Supply Chain: Real-time stock visibility across multiple locations, automated replenishment, serial/lot tracking, and Oracle’s full supply chain suite. The most enterprise-grade module I tested.

Expert Score

Ease of use
5.0
Performance
3.0
Help & Support
4.5
Features
4.0
Price
3.0

Pros

  • 24/7 customer support
  • Offers an integrated eCommerce storefront
  • Extensive global compliance features
  • Tons of modules available for nearly everything you need

Cons

  • Expensive
  • Many features are paid add-ons
  • Excessive modules

Customer Support

4.5

Being a large company owned by a larger company, NetSuite offers its customers numerous avenues through which they can receive help. These include phone, live chat, email, and plenty of self-help resources. That said, the customer support availability differs between plans. All customers get 24/7 support for the most critical issues, but only those with a higher-level plan can access support for non-critical issues around the clock.

Phone Support

Available around the clock for critical issues

Email

Contacting NetSuite via email is an option

24/7 Help & Support

Customer support is available 24/7

FAQ

A detailed FAQ section is available

Live Online Chat

Customers can engage in live chat with customer support agents

Video Tutorials

NetSuite’s YouTube channel is full of helpful tutorial videos

Ease of Use

5.0

NetSuite does its best to make its platform easy to use. It’s not the easiest, though, as the number of features can be overwhelming. In fact, there are tons of consultants out there who earn money helping businesses move to NetSuite. That said, NetSuite offers training programs and extensive live and self-help support resources to shorten the learning curve a bit.

Features & Functionality

4.0

Accounting Software

Robust Financial Tools

NetSuite has it all when it comes to accounting and financial management. Inside its platform, you’ll find core accounting functions, billing, global accounting reconciliation & consolidation, financial planning & reporting, revenue recognition management, and GRC (governance, risk, and compliance) features.

Marketing Features

Many financial-related business solutions focus more on the accounting and finance side of things. Some might also sprinkle in a bit of marketing.

On the other hand, NetSuite offers a suite of marketing tools that you can integrate right into your NetSuite CRM. It provides a full selection of tools dedicated solely to email marketing, such as cart abandonment emails and personalization tools.

Additionally, NetSuite offers partner relationship management and customer service management functionality, among other things. It really aims to let you do everything on one platform.

Supply Chain Management

NetSuite has also developed modules that let you manage your entire supply chain. You can evaluate your supply and weigh it against the demand to plan for the future. From there, you can put in purchase orders and work orders as needed to make your plan come true. Plus, you can integrate the supply chain tools with customer service management to track customer warranties, issue support tickets, and more.

Reporting and Analytics

No business solution would be complete without reporting and analytics, and NetSuite comes in heavy with these features. It offers an entire platform called SuiteAnalytics dedicated to this.

SuiteAnalytics offers the ability to perform highly complex data analysis tasks yet simplifies the UI enough so that doing so is easy — even for inexperienced users. You can save searches and reports, create pivot tables and charts with drag-and-drop, create advanced filters, and more.

NetSuite is also working on advanced AI and machine learning to implement into the platform for even more powerful insights.

Monitor and categorize expenses for accurate financial tracking.

Streamline tax compliance with automated preparation tools.

Automate repetitive accounting tasks to boost efficiency.

Many of NetSuite’s other features come as add-ons. Here are a few of the most notable.

Omni-Channel Commerce Features

Inside NetSuite’s SuiteCommerce, you’ll find a host of omnichannel commerce features that are useful whether you’re B2B or B2C. It offers tools for e-commerce, Points-Of-Sale, order management, product content management, and more. You get an integrated e-commerce storefront with which you can build a site and list a large number of products.

Project Management

NetSuite lets you add on its project management suite, which offers Gantt charts, task management, expense tracking, project billing, automation, much more.

Access accounting tools seamlessly across various devices.

Website Builders

Design & Templates

NetSuite SuiteCommerce has multiple professional-looking templates that you can use to start building your storefront. NetSuite builds some themes, but many are provided by other organizations which gives you a wide variety of choices. There are multiple categories and you’re able to customize the CSS and HTML to tweak elements until you’re satisfied with the final result. Of course, all themes are mobile-optimized by default.

NetSuite is an integrated solution that helps you manage your entire operation from a single backend. It has built-in shipping integrations, subscription billing support, newsletter tools, email marketing management, and much more.

Marketing Tools

NetSuite has integrated multiple marketing tools such as SEO customization, email marketing, contact segmentation, marketing automation, deep tracking capabilities for accurate campaign assessment and attribution, social media promotion, and split testing messages.

Payment options

NetSuite integrates with some of the most popular payment options like Stripe and PayPal as well as newer options such as Amazon Pay and Apple pay. Altogether, there are over a dozen payment options for your customers to take advantage of.

Safety

All stores come with secure SSL certificates so your website will load over HTTPS and encrypt the data from your store and the visitor’s computer. Additionally, it’s PCI DSS compliant and has multiple layers of fraud detection and prevention built-in.

When customers add new cards, you don’t have access to the information and it’s encrypted at rest and transit. Even customer’s personal information is protected by SuiteCommerce so you can be at ease knowing you’re doing your part.

Product Listing and Inventory Management

SuiteCommerce provides the basic product listing features like images, product descriptions, and reviews. It also goes a step further by offering quick views, product comparisons, multiple product variations, and alternate images. Robust search and faceted navigation also work to make products easier to find.

It has robust inventory management that works to ensure you have enough products on hand without overstocking and tying down resources. It uses your historic data such as lead time, seasonal demand, current stock levels, etc. to create optimized reorder points. It also has multiple units of measure that integrate with the way your business works for better inventory management and cost.

The platform also has a well-developed CRM that provides insights into every touchpoint you’ve had with customers. You can see their orders, address, returns, when they’ve contacted support and via which channel, and much more. It gives you a comprehensive overview of how all your efforts are working together to acquire customers and promote loyalty.

Upselling/cross-selling

After someone makes a purchase, they’ll be more receptive to a relevant offer from your brand. NetSuite makes it simple to create one-click upsells, cross-sells, and down-sells based on the rules you set. For example, you can present another product after purchase based on their browsing behavior, the most popular items, or even specific product categories.

Coupons and Discounts

The platform gives you a lot of control over-pricing. In addition to basic coupons which you can use as a promotional tool, you can present different prices for the same product, offer volume discounts, and even provide credit limits. Each customer can get a personalized experience based on what you’ve discussed previously.

Checkout flow customization

Cart abandonment is a serious problem in eCommerce with some estimates putting it as high as 70%. Part of the challenge is the checkout flow. There may be hidden fees, forced account creation, etc. NetSuite gives you the tools to customize the flow with guest account registration, multipage or single page checkout, different pricing displays, and more.

Online Invoicing

Robust Financial Tools

NetSuite has it all when it comes to accounting and financial management. Inside its platform, you’ll find core accounting functions, billing, global accounting reconciliation & consolidation, financial planning & reporting, revenue recognition management, and GRC (governance, risk, and compliance) features. Because of this, your invoicing activity connects with other accounting functions seamlessly for better financial management.

Flexible Billing Scheduling

Do you have several clients that all pay you on a recurring basis, but at different times and on different schedules? NetSuite makes it easy to control all of this thanks to its billing scheduling features.

Through this billing-scheduling feature, you can easily use sale orders to generate invoices while ensuring said invoices date themselves properly. These invoices are also automatically sent out on the correct dates/at the right intervals.

Subscription Management

Another recurring billing feature NetSuite offers is subscription management. You can do all the basics necessary to sell subscription services — defining subscription terms/pricing, subscription proration, creating multiple renewal options, and more.

Reporting and Analytics

No business solution would be complete without reporting and analytics, and NetSuite comes in heavy with these features. It offers an entire platform called SuiteAnalytics dedicated to this.

SuiteAnalytics offers the ability to perform highly complex data analysis tasks yet simplifies the UI enough so that doing so is easy — even for inexperienced users. You can save searches and reports, create pivot tables and charts with drag-and-drop, create advanced filters, and more.

NetSuite is also working on advanced AI and machine learning to implement into the platform for even more powerful insights.

Process payments seamlessly with integrated systems.

Track time spent on projects for accurate billing.

Available on multiple devices for accessibility.

Affordable pricing to fit varied business needs.

CRM

Dashboard

oracle netsuite Dashboard

Customer Service Management

NetSuite CRM helps businesses to relate with their customers and nurture potential leads to loyal customers. This feature allows businesses to create custom dashboards for their clients and provide a seamless flow of information across the entire customer lifecycle.

NetSuite has a built-in customer response tool to expedite case resolutions by assigning, managing, and routing customer support cases via phone, fax, email, and the web.

The included reporting tools allow you to monitor your customer service team’s metrics, including call times, customer satisfaction scores, subscription renewal rates, and call volumes.

Oracle netsuite Customer Service Management

NetSuite offers robust marketing automation, allowing you to automate a number of routine tasks related to emails and social media management. Automated workflows allow you to identify sales-qualified leads much faster, allowing sales reps to capitalize on hot deals. Furthermore, features like data segmentation and premade templates allow you to quickly generate personalized marketing content and engage relevant users. Finally, you can quickly populate your CRM with new leads through web forms, allowing sales reps to quickly assess the needs of each customer and act accordingly.

SalesForce Automation

Designed primarily for e-commerce businesses, the SFA offers incredible visibility into all aspects of customer relationships, including support tickets, purchasing history, and inventory. This information allows sales reps to upsell, cross-sell, and drive order renewals.

Oracle NetSuite doesn’t provide any concise information regarding the reporting features. However, it’s possible to analyze campaign statistics and ROI from the very start of the marketing campaign up to the final order transaction. There are also a number of sales-related reports available with a detailed analysis of customer interactions including phone calls, emails, tasks, meetings, and notes.


In terms of integrations, the brand also doesn’t provide a list of available apps. However, we have confirmed that the app can be integrated with SalesForce, HubSpot, Shopify, Celigo, MailChimp, Nimble, and Quick Base. You will need to contact the vendor for more information.

Streamline communication with integrated email tools.

Partner Relationship Management

The partner relationship management feature creates a conduit between partners and your organization to streamline workflow, improve customer satisfaction and drive revenue.

This NetSuite feature gives you full control over every partner-focused sales and marketing element. You can easily generate key performance indicators and other metrics that you can present to your partners toward achieving mutual objectives.

The feature includes joint marketing campaigns, lead management, sales forecasting, pipeline management, order processing, and partner commissions and royalties.

oracle netsuite Partner Relationship Management

NetSuite CPQ

NetSuite CPQ (Configure Price Quote) feature enables businesses and their clients to configure products and services, price orders, and generate quotes. This feature enables you to create 3D product visualizations and automate the generation of sales proposals to enhance further and accelerate the sales process.

NetSuite CPQ feature has a configurator tool that enables salespeople and customers to select any product available and its physical features and apply customizable business rules to ensure that every configuration is correct, saving money on double and triple checks and reworking orders.

NetSuite CPQ

One of the exceptional features of NetSuite CRM is sales force automation. This feature helps to streamline and unify all your sales processes on a single dashboard. It gives a birds-eye view into every aspect of the customer relationship, including support cases and back-office information such as contracts, inventory, and order history.

oracle netsuite Customizing CRM tools

The sales force automation has real-time dashboards for sales representatives and managers to gain better insights to sell, upsell and align customer expectations. It has activities, leads, analytics, reports, and a support interface for business managers. At the top right corner, you can identify sales orders waiting for your approval, tasks to complete, and other notifications regarding your workflow.

Bookkeeping

Dynamic General Ledger

Instead of creating a static GL you have to adapt your business to, NetSuite made it the other way around. You can customize the general ledger to fit your unique and ever-changing business needs. Thanks to mapping capabilities, you can make it so entering one transaction in one ledger updates everything appropriately in other ledgers.

NetSuite’s GL also cuts down on manual journal entry work by adding customer GL impact lines that flow through to other books. This reduces time spent on account recs, closes, and more.

Accounts Receivable

NetSuite’s A/R solution automates and streamlines many aspects of the collections process, saving you time while improving your cash flows. It automatically posts transactions associated with orders to the correct accounts in your ledgers and even calculates the proper sales tax. Plus, you can offer customers self-service access to various pieces of order information.

You can create recurring invoices, too, in case you have regular clients/customers.

Tax Management

Tax compliance is a pain in one locality alone. When you’re doing business in multiple states and even countries, however, it becomes impossible to keep everything straight without the right software.

NetSuite fills this need quite nicely. It automates tax calculations for over 50 countries in all the correct currencies. It gets everything right, from supranational organizations like the EU down to foreign localities. You’ll save untold hours on working out your taxes and fixing errors, thanks to NetSuite.

Fixed Asset Management

Most small business software solutions don’t delve much into fixed assets. However, since NetSuite serves businesses of all sizes, it has a solid fixed asset management interface built-in.

In NetSuite, you can manage the entire lifecycle of each of your fixed assets. It supports all standard depreciation methods but also lets you customize your own if needed. Plus, you can integrate fixed assets with the general ledger to automatically post any depreciation or asset retirement transactions.

Reporting and Analytics

NetSuite has an entire suite of analytics features for all of its modules called SuiteAnalytics. However, let’s focus specifically on NetSuite’s financial reporting capabilities.

NetSuite offers tons of out-of-the-box reports, but of course, you can create your own as well. All reports are flexible, letting you customize them to see whatever types of transactions you’d like over whatever time period you prefer. You can tailor each report to various presentation formats depending on who needs to see them.

As you’d expect, NetSuite helps ensure all of these reports maintain compliance with all relevant accounting standards.

Beyond financial reporting, NetSuite also lets you see reports that give you operational and statistical views of your business.

Simplify and optimize tax filing with expert features and tools.

Automate repetitive tasks to improve efficiency and productivity.

Many of NetSuite’s other features come as add-ons. Here are some of the most notable.

Omni-Channel Commerce Features

SuiteCommerce offers a host of omnichannel commerce features useful for B2B and B2C. There are things for e-commerce, Points-Of-Sale, order management, product content management, and much more. Plus, NetSuite gives you an integrated e-commerce storefront to create an online presence with.

Project Management

NetSuite has a project management suite, offering Gantt charts, task management, project billing, expense tracking, automation, and more.

Access and use on a variety of compatible devices.

Flexible pricing structures tailored to different needs and budgets.

Expand functionality with additional tools and integrations.

eCommerce

The NetSuite e-commerce CMS solution allows you to manage most business processes from a single backend. To boost your online sales, you can set up subscription billing, access built-in shipping integrations, manage your email newsletter and deeper email marketing, and more.

Here are some of the top features:

  • Unified business management
  • Real-time visibility and analytics
  • Global business management
  • Extensive customization options
  • Comprehensive financial management
  • Supply chain and inventory management
  • Order and billing management
  • Revenue recognition management
  • Multi-language and multi-currency support
  • Marketing tools
  • Scalable cloud infrastructure
  • Email marketing
  • Marketing automation
  • Cart abandonment
  • Product listing
  • Payment options
  • Safety

Here’s a detailed overview:

Unified Business Management

NetSuite website builder provides a single, integrated suite for managing various business functions, such as finance, operations, and customer relations. It enables organizations to streamline processes and enhance efficiency across departments.

When I tested NetSuite’s e-commerce platform, I found that its integrated business suite simplifies managing finance, operations, and customer relations. Instead of using multiple tools, businesses can handle everything within one system, making it easier to streamline processes and improve efficiency across departments.

Real-time Visibility and Analytics

I played with NetSuite’s analytics tools and found them useful for tracking key business metrics in real time. The CMS platform provides insights that help businesses make quick, data-driven decisions. This feature allows for better strategic planning, ensuring that operational adjustments are based on accurate performance data.

real-time-visibility

Global Business Management

NetSuite tools support global online operations with capabilities to manage multiple subsidiaries, business units, and legal entities across various countries, languages, and currencies. This facilitates centralized control while accommodating local variations.

Extensive Customization Options

Through SuiteCloud, NetSuite allows extensive customization to meet specific business needs. This includes the ability to tailor workflows, forms, and scripts, ensuring the software adapts to unique business processes and requirements.

extensive-customization

Comprehensive Financial Management

NetSuite's financial management tool automates essential financial tasks such as general ledger, accounts receivable, and accounts payable, improving accuracy and reducing manual workload.

Supply Chain and Inventory Management

When I tested NetSuite’s e-commerce platform, I found that its inventory management, procurement, and order fulfillment tools help businesses maintain the right stock levels while minimizing costs. The system automates supply chain processes, ensuring that inventory remains balanced without excessive overstocking.

I played with the inventory management features, and they provided real-time insights into stock availability. The platform analyzes historical data, lead times, current stock, and seasonal demand to calculate the best reorder points. This ensures businesses always have enough products to meet demand without unnecessary storage costs.

One of the standout features I explored was NetSuite’s CRM, which provides a complete view of every customer interaction. It tracks orders, returns, browsing history, support interactions, and customer lifetime value, helping businesses enhance engagement and personalize the shopping experience.

supply-chain-and-inventory-management

Order and Billing Management

NetSuite streamlines order and billing processes, enabling efficient management of the complete order lifecycle from sales quote to fulfillment and ensuring timely invoicing and payment collection.

Revenue Recognition Management

The system supports complex revenue recognition requirements, which is crucial for compliance and accurate financial reporting, particularly for companies with subscription-based revenue models.

Multi-language and Multi-currency Support

NetSuite supports over 190 currencies and 27 languages, making it suitable for multinational businesses and facilitating operations across diverse geographic locations.

Marketing Tools

When I tested NetSuite’s e-commerce platform, I found its marketing suite packed with features that help businesses sell online more effectively. The platform includes SEO optimizations, email marketing, and multi-channel automation, ensuring that campaigns reach the right audience at the right time.

Campaign Tracking and Attribution
The campaign tracking tools, which provide real-time data on marketing performance. The platform offers split testing, social promotion, and contact segmentation, allowing businesses to refine their e-commerce website design and messaging for better conversion rates.

Enhancing Visibility and Engagement
NetSuite’s e-commerce platforms with SEO features help drive organic traffic, while automation ensures seamless engagement across multiple channels. These marketing tools make it easier to manage promotions and track performance, giving businesses a competitive edge in selling online.

marketing-tools

Scalable Cloud Infrastructure

Being a true cloud solution, NetSuite offers a scalable infrastructure that supports business growth without the need for physical IT expansions, providing flexibility and a lower total cost of ownership.

Email Marketing

Email can be one of the most effective ways to increase the lifetime value of your customers. NetSuite has a built-in email marketing tool that allows you to send newsletters, set up automation, segment contacts, and even A/B test campaigns for optimal results.

Marketing Automation

Automate the entire customer lifecycle using smart rules and past behavior to boost lifetime value. SuiteCommerce provides event-triggered campaigns, campaigns based on order history, multichannel campaigns, and more. Set up the rules and the campaigns will run automatically until you choose to change them.

Cart Abandonment

Cart abandonment, in many cases, is up to 70%. That means 70% of the people who land on your website and initiate the checkout process don’t complete it. With a well-designed cart abandonment recovery campaign, you can get up to 20% of those people to finish their purchase. SuiteCommerce has built-in cart abandonment workflows you can take advantage of to boost your revenue. These include email campaigns, checkout customization, guest account registration, and more.

Product Listing

It has the expected product listing features like product descriptions, images, and reviews. It also incorporates quick views, product comparisons, alternative images, and product variations. Finally, there’s an advanced search function coupled with faceted navigation to make it easier for visitors to find what they’re looking for.

Payment options

It has ready integrations with popular payment options like PayPal and Stripe. It also works with newer payment options such as Apple Pay and Amazon pay. The end result is the ability to present multiple payment options to your customers with the aim of boosting conversions.

Safety

All stores come with secure SSL certificates so your website will load over HTTPS and encrypt the data from your store and the visitor’s computer. Additionally, it’s PCI DSS compliant and has multiple layers of fraud detection and prevention built-in.

When customers add new cards, you don’t have access to the information and it’s encrypted at rest and transit. Even customer’s personal information is protected by SuiteCommerce so you can be at ease knowing you’re doing your part.

Design & Templates

An eCommerce platform isn’t much without beautiful templates and SuiteCommerce delivers. It has many professional-looking templates to jumpstart your site design process. In addition to the themes provided by NetSuite, there are other themes provided by third parties that give you even more options. You can customize your website down to the CSS and HTML files to ensure you’re satisfied with the final result. Of course, all themes come mobile optimized.

Drive traffic and boost sales with tools for targeted campaigns and analytics.

Payroll Services

Efficient Payroll Completion

Completing payroll operations manually can be unreasonable for medium to large businesses with more than 20 employees. Manually keeping up with each employee's payroll, compliance and benefits can take a toll on your payroll personnel. Manual payroll completion can also incur the consequences of erroneous payment and compliance operations on your business.

NetSuite SuitePeople Payroll makes your entire payroll highly efficient and less costly. Since the platform is mainly automated and relatively easy to use, you'll spend less time completing these processes while achieving error-free payroll outcomes.

Batch Payroll Processing

NetSuite SuitePeople Payroll is ideal for companies that run batch payroll processes. It automates the batch calculations of employee earnings, taxes, and the business's contribution towards each employee's benefits. You can also categorize and find your employees according to their locations, portfolios, and benefits. One impressive feature of this batch payroll processing is that you know how a payroll batch directly affects your financials as soon as it is completed.

Managers can also reverse or make changes to payroll information without the need to reenter previous data.

Premium Customer Support

NetSuite Suite People Payroll's customer support team is licensed by APA, the American Payroll Association, and is always prompt to provide expert help to the software users. They also ensure that you never lag behind payroll-compliant laws and procedures during your use of the software.

Employee Self-Service

This platform makes it effortless for your employees to update their personal and tax-related information in real-time. The employee self-service feature of this platform gives employees access to know their colleagues within the organization for networking and collaboration. Employees also have access to their expense reports and up to five of their previous paychecks. They can also request time-offs and make changes to their bank details.

Flexible Payment Schedules and Options

On this platform, you have the liberty to choose the payment schedule that is best for your business. Invariably, you can decide to make your payments hourly, daily, weekly, bi-weekly, monthly, or annually. You can also make payments at times other than your initially proposed cycle.

The flexibility of this platform also allows you to include or exclude items like compensations, commissions, and work bonuses in paychecks.

Support for Multi-State Employees

If you have your employees based in different states, NetSuite SuitePeople ensures no additional strain on your payroll team due to geographical differences.

In addition to accessing each employee's payroll, compliance, and work data in real-time, you can access a wide range of payment options for each state. You can pay your employees via direct bank deposits in more than ten banks. You can also pay them via checks, and the platform ensures that the checks can be printed locally – according to the jurisdiction prevalent in each client's location.

Integrations and Add-Ons

Oracle NetSuite does not only cover your payroll needs. They run a host of other management tools with several application experts in a system known as SuiteCloud Connect. This system integrates with leading enterprise software systems to ensure the unification of your business processes.

And as you can guess, it means that you can easily streamline your entire workflow in one place via numerous integrations. From the SuitePeople Payroll, you can easily access your financial management, logistics, planning and budgeting, procurement, and product management platforms.

Consequently, you won't need to import and export your business/employee data from one platform to another with this platform. The integrations ensure that relevant data is updated on each platform in real-time.

SuitePeople integrates with NetSuite's other modules such as financials, inventory, and order management. It has customizable workflows that can be tailored to match an organization's payroll processes. It also has compliance management features that help ensure that organizations stay in compliance with federal and state regulations.

SuitePeople Payroll helps ensure compliance with federal and state regulations by automatically handling complex tax calculations, wage and hour laws, and benefits administration. It can also automate payroll runs based on customizable schedules and handle approvals through workflow automation.

SuitePeople offers a full suite of HR tools including time and attendance management to help organizations track employee hours, manage paid time off, and handle time-off requests. It also assists with onboarding and offboarding features to help organizations manage the hiring and termination of employees.

Walk-Through of HR & Employee Dashboard

Click the video to see a quick demo of the HR & employee portal features:

https://www.youtube.com/watch?v=CbRc4NL0f0Q

Stay compliant with built-in tax management features.

As a NetSuite product, SuitePeople integrates with their other products including:

  • Financial management, accounting, budgeting, and forecasting.
  • Order management, including sales order processing, order fulfillment, and inventory management.
  • CRM including lead and opportunity management, marketing automation, and customer support

Project Management

Oracle NetSuite Project Management has a wide range of features and tools to help businesses get their projects under control and stay on top of them. It has what you’d expect such as managing teammates, task creation, and assigning to other team members. It also has more robust features than average project management tools.

File Sharing

NetSuite enables secure and efficient file sharing by providing centralized document storage, real-time collaboration, version control, and role-based access permissions across teams.

NetSuite File Sharing & Document Management

Project billing

The platform has multiple options that will allow you to bill projects in a way that makes the most sense for you and your clients. You can bill based on project completion, specific milestones, or a regular timeframe. These billing types can be created specifically for a project or can be recycled from previous uses. It’ll calculate the billable hours (if that’s how you’re charging) and add them to an invoice to be sent to your clients.

Netsuit Project billing

Budgeting

Budgeting is an essential aspect of project management and NetSuite works to make sure you stay on time and on budget. You can create an initial budget or job costing and then keep track of it to understand how much you’ve truly spent on the project. Since it’s an entire ERP, it’ll automatically make deductions and additions to the right expense accounts so your books are always up to date.

Netsuit Budgeting

Risk Forecasting

All projects carry risk to some extent. Sometimes, that risk is easily manageable. At other times, it’s one of the largest determining factors related to the project. The project management suite allows managers and project owners to acknowledge and prioritize the risk of a project. Once risk is established and assigned a value, the finance department can then extrapolate the impact on future revenue growth.

Netsuit Risk Forecasting

Enhance team collaboration with integrated communication features.

Gantt Chart

Interactive Gantt charts in NetSuite provide real-time project visualization, allowing teams to schedule tasks, manage dependencies, and monitor project progress with dynamic drag-and-drop ease.

Netsuite Gantt Charts & Timeline view

Task Management

NetSuite streamlines task management by allowing teams to assign, prioritize, and track tasks in real time, ensuring projects stay organized and on schedule.

Netsuite Task Management & Kanban Boards

Time Tracking

NetSuite offers integrated time tracking that captures hours worked in real time, improving project billing accuracy, resource planning, and productivity insights.

Netsuite Time Tracking & Productivity Insights

Powerful reporting is a must and NetSuite delivers in that regard. It offers dozens of reports which can be automatically generated depending on how you’re using the platform. For example, there are reports comparing the budget of a project vs the actual expenditures, unbilled time, earned value by project, and so much more.

The platform is accessible via mobile application and web browsers which makes it possible to stay abreast of important work irrespective of where you are. Of course, It’s compatible with almost every single web browser out there.

One drawback is that it has few native integrations. Instead, it has connector services that let you pull in data or send out data from third-party services. While this may work, the integrations aren’t supported by NetSuite and you may need to maintain them yourself in certain instances.

Netsuit Analytics & Reports

Inventory Management

Cycle Counting

NetSuite Inventory Management Software allows users to assess stock reserves in real-time. This way, overhead costs are completely eliminated with the lessening of safety stock levels.

Oracle netsuite Cycle Counting

Stock Tracing

You needn’t worry about where your products are- whether they have arrived or are en-route. The software allows business owners to trace stock via serial number or lot, thus enabling maximum stock visibility. In addition, the software takes note of all ongoing transactions, concisely displaying relevant information on your dashboard.

Oracle netsuite Stock Tracing

Replenishment

You can also create your preferred reordering points and stock levels to help you maintain a good inventory quantity. Thus, users will be able to handle business operations in different locations, catering to demand in different locations simultaneously.

Oracle netsuite Replenishment

Warehousing

With its special warehousing features, NetSuite Inventory Management allows business owners to administer the tracking of stock in different locations, showing a comprehensive breakdown of available physical warehouses.

NetSuite Inventory Management also comes with special accounting and finance tools that combine real-time fiscal viability, in-depth accounting function, and key business insight to help you make better financial decisions in your business. With the billing feature, you can integrate finance and sales for easy processing.

Just as well, the financial reporting and planning tools enable users to integrate budgeting, planning, forecasting to render on-demand, real-time, decision-making data.

NetSuite Inventory Management Software is a cloud-based platform that is accessed upon subscription to the service. It is accessible from PC and mobile browsers and a mobile app on Android and iOS.

Oracle netsuite Warehousing

Customer Database

Oracle netsuite Customer Database

Oracle Netsuite also offers advanced inventory management features to streamline the supply chain processes and boost productivity. These are below:

The inventory management software also offers a host of reporting and analytics features to empower businesses with actionable insights, optimize inventory levels, identify trends, and reduce carrying costs. Oracle Netsuite supports data-driven decision-making for improved operational efficiency and profitability with these features:

There are integrations with Asana, Authorize.net, Avalara, BambooHR, BigCommerce, Braintree, ChannelAdvisor, Copper, DEAR Inventory, Domo, Dynamics 365, FedEx for Salesforce, FedEx Ship, FreshBooks, Gusto, IBM Connections. In addition, there is API integration capability.

ERP

NetSuite ERP stands out due to its extensive range of features designed to enhance business efficiency and visibility, making it a comprehensive solution for businesses of all sizes.

Financial Management

  1. General Ledger

    NetSuite's comprehensive general ledger offers real-time visibility into financial data, enabling businesses to track and manage their finances accurately. This feature supports multi-currency transactions and consolidations, making it ideal for businesses with global operations.
  2. Accounts Receivable/Payable

    The accounts receivable and payable modules streamline the management of receivables and payables. Automation of invoicing, payment processing, and collections helps reduce manual errors and improve cash flow management.
  3. Financial Reporting

    NetSuite's customizable reports and dashboards provide deep insights into financial performance. Businesses can generate tailored financial statements, track key performance indicators (KPIs), and analyze trends to make informed decisions.

CRM

  1. Customer Relationship Management

    NetSuite’s CRM tools manage customer interactions, sales, and marketing activities. It provides a unified view of customer data, helping businesses improve customer relationships and drive sales growth.
  2. Sales Force Automation

    The sales force automation feature automates sales processes, enhancing productivity and efficiency. This includes lead management, opportunity tracking, and sales forecasting, ensuring that sales teams can focus on closing deals.
  3. Customer Service Management

    Enhancing customer support and satisfaction, NetSuite’s customer service management tools help track customer issues, manage service cases, and ensure timely resolutions, improving overall customer experience.

    Netsuite - top customers
  4. Inventory Control

    NetSuite offers real-time tracking of inventory levels, helping businesses maintain optimal stock levels and reduce carrying costs. This feature ensures accurate inventory counts and visibility across multiple locations.
  5. Order Management

    The order management module automates order processing and fulfillment. This streamlines the order-to-cash cycle, reduces processing time, and ensures that orders are fulfilled accurately and promptly.
  6. Warehouse Management

    Optimizing warehouse operations and logistics, NetSuite’s warehouse management tools enhance inventory accuracy, improve warehouse efficiency, and streamline picking, packing, and shipping processes.

E-commerce

  1. E-commerce Integration

    NetSuite seamlessly integrates with various e-commerce platforms, providing a unified solution for managing online and offline sales channels. This integration helps businesses synchronize inventory, orders, and customer data across all channels.
  2. Online Storefronts

    NetSuite provides tools for creating and managing online stores. Businesses can design attractive storefronts, manage product catalogs, and offer a seamless shopping experience to customers.
  3. Payment Processing

    Secure and efficient payment processing is facilitated through NetSuite's integration with various payment gateways. This ensures that transactions are processed quickly and securely, enhancing customer trust and satisfaction.

Human Capital Management

  1. Payroll Processing

    NetSuite automates payroll and compliance tasks, ensuring that employees are paid accurately and on time. This feature also helps businesses stay compliant with local labor laws and regulations.
  2. Time and Attendance

    The time and attendance tracking feature accurately records employee working hours. This data can be used for payroll processing, labor cost analysis, and ensuring compliance with labor regulations.
  3. Employee Self-Service

    NetSuite provides an employee self-service portal where employees can access their information, submit leave requests, and view payroll details. This empowers employees and reduces the administrative workload for HR departments.

Project Management

  1. Project Accounting

    NetSuite’s project accounting tools track project costs and profitability in real-time. This helps businesses monitor project budgets, manage expenses, and ensure that projects remain profitable.
  2. Resource Management

    Optimizing resource allocation and utilization, NetSuite’s resource management features help businesses assign the right resources to the right projects. This ensures efficient use of resources and improves project outcomes.
  3. Time Tracking

    Detailed tracking of time spent on projects is facilitated by NetSuite’s time tracking feature. This ensures accurate billing, improves project cost management, and helps track project progress.

NetSuite ERP’s wide array of features makes it a versatile and powerful tool for enhancing business operations across various functions. Whether it’s financial management, customer relationship management, inventory management, e-commerce, human capital management, or project management, NetSuite provides the tools needed to improve efficiency, visibility, and overall business performance.

Netsuite - KPIs

Monitor and manage business expenses effortlessly.

Simplify tax compliance and reporting.

Automate key processes for improved efficiency.

Enhance ERP capabilities with additional modules.

Access ERP tools across a range of devices.

Supply Chain

Oracle SCM Cloud delivers some of the best supply chain management software tools. It covers every base with a wide array of features and functionalities. Here’s a look at some of the attributes of these supply chain management tools:

  • Demand management
  • Supply planning
  • Sales and operations planning
  • Supply chain collaboration
  • Materials management
  • Inventory optimization
  • Cost management
  • Discrete manufacturing
  • Process manufacturing
  • Production scheduling
  • Smart operations
  • Service logistics
  • Omnichannel order management
  • Transportation management
  • Warehouse management
  • Product lifecycle management
  • Procurement
  • Sustainability

Demand Management

Oracle SCM Cloud allows you to improve your supply chain optimization by conducting advanced demand forecasting and implementing the necessary strategies to make alterations on the fly rather than reacting slowly and dealing with understock or overstock issues.

Oracle demand management

Supply Planning

Better manage supply chain planning through Oracle’s end-to-end cloud software. Using machine learning, you can combine supply constraints, input from stakeholders, and demand insights, ultimately boosting profitability.

Sales and Supply Chain Operations Planning

The platform integrates planning processes across sales, marketing, finance, and supply chain operations, promoting enterprise-wide consensus and operational agility. By leveraging built-in collaborative tools, businesses can develop realistic supply and demand plans, compare constrained planning scenarios, and gain valuable insights through personalized, KPI-driven dashboards.

This real-time integration ensures that operational and strategic goals are continuously aligned, allowing businesses to respond to changes and make data-driven decisions proactively. Constantly monitor and resolve any problems arising through this supply chain management software for small businesses and large operations alike.

Supply Chain Collaboration

Quickly spot any potential network disruptions within your own business or with any of your partners. Automate these processes so your supply chain is more efficient and agile, enhancing monitoring and visibility across the network.

Materials Management

Manage your inventory from anywhere thanks to the easy-to-use mobile app. Lower errors in your shipping management, improve efficiency, and better predict demand levels.

Inventory Optimization

Oracle’s SCM software constantly monitors data to ensure that businesses have sufficient inventory and automatically orders replenishments as needed. The knock-on effect is keeping cash flow strong and on track.

Oracle manage inventory

Cost Management

Account for all costs in the supply chain process in one place. Simplify your accounting to get access to real-time tracking of your financials so you always have a good picture of your current situation.

Oracle cost managment

Discrete Manufacturing

Track and trace serial numbers so you always know where your inventory is, and utilize leading supply chain management software to have the most efficient shop floor execution possible.

Process Manufacturing

Businesses can improve their process manufacturing by digitally running their plan through Oracle’s software, which will then make recommendations that you can automatically implement.

Production Scheduling

Create in-depth executable schedules to maximize your resources and reduce waste. Quickly identify the impact of any changes to the schedule and proactively remove any bottlenecks as soon as they arise.

Smart Operations

Leverage artificial intelligence to reduce the time staff spends on non-value-adding activities like manual data entry, excessive reporting, and slow communication channels. Standardize requirements and instructions to ensure staff comply with all obligations.

Logistics

Utilize the Oracle SCM Cloud supply chain logistics software to lower logistics costs, quickly adapt to any business disruptions like material shortages, and implement relevant changes to your supply chain management plan. Stay organized by clearly seeing all requests and managing everything from one place.

Orcale logistic

Omnichannel Order Management

Oracle SCM Cloud’s software allows for faster order execution, boosts profits, and enhances customer support as it looks after the transactional steps when a customer places an order, such as the receipt, delivery, invoice, and collection of the payment.

It also covers multiple systems and allows for global order processing and dynamic pricing.

Transportation Management

Properly manage all the transportation for your global supply chain in an easy manner, thanks to the quality SCM software, helping to lower freight costs by pinpointing the most optimal delivery routes, consolidating shipments, and improving load planning, becoming more efficient across the board.

Warehouse Management

Significantly boost your warehouse operations to ensure your business is always in line with demand obligations.

Oracle SCM Cloud takes control of complicated fulfillment and provides complete visibility over your inventory at all stages, from leaving distribution centers to hitting the shelves.

Product Lifecycle Management

Oracle's Product Lifecycle Management (PLM) software accelerates time-to-market for new products, reduces costs, and enhances overall quality.

By standardizing processes and centralizing data, Oracle’s PLM platform ensures seamless collaboration and harmonization across all product development phases. This digital thread connects and optimizes supply chain operations, enabling businesses to manage every stage of a product's lifecycle—from initial concept and design to market introduction and eventual phase-out.

Oracle’s integrated solution fosters innovation, improves data visibility, and ensures consistent product quality and cost efficiency, delivering a competitive edge in dynamic markets.

Procurement

Integrate and streamline your source-to-pay through easy-to-use software, and collaborate with suppliers in a hassle-free way.

oracle Procurement

Fusion Data Intelligence

Learn more about your supply chain through Oracle’s software to look at all aspects of your business by collating data and analytics before leveraging AI to provide deeper insights and help you make better decisions.

Sustainability

Store and manage all data related to the Environmental, Social, and Governance (ESG) activities of your business, such as energy usage, emissions, and recycling.

Given the wide-ranging functionality of the software and its features, some users may encounter a learning curve when integrating it into their business processes. To facilitate a seamless transition, Oracle provides several training options.

The platform's capabilities perform on the following operating systems:

Oracle SCM Cloud delivers some of the best supply chain management software tools. It covers every base with a wide array of features and functionalities. Here’s a look at some of the attributes of these supply chain management tools:

  • Demand management
  • Supply planning
  • Sales and operations planning
  • Supply chain collaboration
  • Materials management
  • Inventory optimization
  • Cost management
  • Discrete manufacturing
  • Process manufacturing
  • Production scheduling
  • Smart operations
  • Service logistics
  • Omnichannel order management
  • Transportation management
  • Warehouse management
  • Product lifecycle management
  • Procurement
  • Sustainability

Demand Management

Oracle SCM Cloud allows you to improve your supply chain optimization by conducting advanced demand forecasting and implementing the necessary strategies to make alterations on the fly rather than reacting slowly and dealing with understock or overstock issues.

Oracle demand management

Supply Planning

Better manage supply chain planning through Oracle’s end-to-end cloud software. Using machine learning, you can combine supply constraints, input from stakeholders, and demand insights, ultimately boosting profitability.

Sales and Supply Chain Operations Planning

The platform integrates planning processes across sales, marketing, finance, and supply chain operations, promoting enterprise-wide consensus and operational agility. By leveraging built-in collaborative tools, businesses can develop realistic supply and demand plans, compare constrained planning scenarios, and gain valuable insights through personalized, KPI-driven dashboards.

This real-time integration ensures that operational and strategic goals are continuously aligned, allowing businesses to respond to changes and make data-driven decisions proactively. Constantly monitor and resolve any problems arising through this supply chain management software for small businesses and large operations alike.

Supply Chain Collaboration

Quickly spot any potential network disruptions within your own business or with any of your partners. Automate these processes so your supply chain is more efficient and agile, enhancing monitoring and visibility across the network.

Materials Management

Manage your inventory from anywhere thanks to the easy-to-use mobile app. Lower errors in your shipping management, improve efficiency, and better predict demand levels.

Inventory Optimization

Oracle’s SCM software constantly monitors data to ensure that businesses have sufficient inventory and automatically orders replenishments as needed. The knock-on effect is keeping cash flow strong and on track.

Oracle manage inventory

Cost Management

Account for all costs in the supply chain process in one place. Simplify your accounting to get access to real-time tracking of your financials so you always have a good picture of your current situation. Budgets that cannot stretch to a full suite are better served starting with the best free accounting software and migrating later.

Oracle cost managment

Discrete Manufacturing

Track and trace serial numbers so you always know where your inventory is, and utilize leading supply chain management software to have the most efficient shop floor execution possible.

Process Manufacturing

Businesses can improve their process manufacturing by digitally running their plan through Oracle’s software, which will then make recommendations that you can automatically implement.

Production Scheduling

Create in-depth executable schedules to maximize your resources and reduce waste. Quickly identify the impact of any changes to the schedule and proactively remove any bottlenecks as soon as they arise.

Smart Operations

Leverage artificial intelligence to reduce the time staff spends on non-value-adding activities like manual data entry, excessive reporting, and slow communication channels. Standardize requirements and instructions to ensure staff comply with all obligations.

Logistics

Utilize the Oracle SCM Cloud supply chain logistics software to lower logistics costs, quickly adapt to any business disruptions like material shortages, and implement relevant changes to your supply chain management plan. Stay organized by clearly seeing all requests and managing everything from one place.

Orcale logistic

Omnichannel Order Management

Oracle SCM Cloud’s software allows for faster order execution, boosts profits, and enhances customer support as it looks after the transactional steps when a customer places an order, such as the receipt, delivery, invoice, and collection of the payment.

It also covers multiple systems and allows for global order processing and dynamic pricing.

Transportation Management

Properly manage all the transportation for your global supply chain in an easy manner, thanks to the quality SCM software, helping to lower freight costs by pinpointing the most optimal delivery routes, consolidating shipments, and improving load planning, becoming more efficient across the board.

Warehouse Management

Significantly boost your warehouse operations to ensure your business is always in line with demand obligations.

Oracle SCM Cloud takes control of complicated fulfillment and provides complete visibility over your inventory at all stages, from leaving distribution centers to hitting the shelves.

Product Lifecycle Management

Oracle's Product Lifecycle Management (PLM) software accelerates time-to-market for new products, reduces costs, and enhances overall quality.

By standardizing processes and centralizing data, Oracle’s PLM platform ensures seamless collaboration and harmonization across all product development phases. This digital thread connects and optimizes supply chain operations, enabling businesses to manage every stage of a product's lifecycle—from initial concept and design to market introduction and eventual phase-out.

Oracle’s integrated solution fosters innovation, improves data visibility, and ensures consistent product quality and cost efficiency, delivering a competitive edge in dynamic markets.

Procurement

Integrate and streamline your source-to-pay through easy-to-use software, and collaborate with suppliers in a hassle-free way.

oracle Procurement

Fusion Data Intelligence

Learn more about your supply chain through Oracle’s software to look at all aspects of your business by collating data and analytics before leveraging AI to provide deeper insights and help you make better decisions.

Sustainability

Store and manage all data related to the Environmental, Social, and Governance (ESG) activities of your business, such as energy usage, emissions, and recycling.

Features

  • General Ledger
  • Bookkeeping
  • Manages Accounts Payable/Receivable
  • Income & Expenses Tracking/Management
  • Account Reconciliations
  • Financial Reporting
  • Receipt Scanning
  • Invoicing
  • Record Expenses
  • Generate Invoices

NetSuite Alternatives

Oracle-NetSuite_l
4.4(8)

Starting from: Custom Pricing/month

NetSuite Limited

Custom Pricing

seat/month

Pros

  • 24/7 customer support
  • Offers an integrated eCommerce storefront
  • Extensive global compliance features
  • Tons of modules available for nearly everything you need

Cons

  • Expensive
  • Many features are paid add-ons
  • Excessive modules
Sage logo
4.6(0)

Starting from: $128.67/month

Pro Accounting

$128.67

seat/month

Pros

  • Create separate profiles for your employees and accountant
  • Send clients invoices directly from the dashboard
  • Automatically backup and secure your data

Cons

  • Limited customization
  • No payroll processing features
Intuit_quickbooks_logo
4.5(25)

Starting from: $0/month

Free

$0

seat/month

Pros

  • Robust and secure cloud-based software
  • Customizable and intuitive dashboard and reports
  • Numerous integrations
  • Full desktop and mobile access

Cons

  • Lack of 24/7 customer phone support (except for Advanced)
  • Payroll costs extra
  • Learning curve

Verdict

After testing NetSuite across all its modules, I found it to be the strongest all-in-one ERP for businesses that have outgrown point solutions. The platform keeps financials, operations, and customer data in sync — without relying on integrations that tend to break. It’s built for businesses scaling fast and needing real-time visibility across every department, not just a better accounting package.

What works well

✓  True all-in-one ERP: Accounting, CRM, eCommerce, payroll, inventory, and project management in one platform

✓  Global-ready out of the box: 190+ currencies, 27 languages, tax compliance in 50+ countries

✓  SuiteAnalytics gives every team real-time dashboards and saved searches: No exports needed

✓  24/7 customer support included on all plans

✓  Scales from mid-market to enterprise on the same platform

What to watch out for

✗  Custom pricing only: Expect a significant investment before seeing a number

✗  Heavy add-on structure: Advanced payroll, project management, and supply chain are separate modules

✗  Steep implementation — most businesses hire consultants to onboard properly

✗  Not designed for small businesses or simple use cases

Use NetSuite if you are...

→  A growing mid-market business that has outgrown QuickBooks or Xero

→  Running multi-entity, multi-currency, or international operations

→  Looking to consolidate 5+ tools into one connected platform

→  An Ecommerce or subscription-based business needing integrated order and revenue management

Skip NetSuite if you are...

✗  A small business or startup — the cost and complexity will outweigh the benefits

✗  Looking for transparent, upfront pricing

✗  Running a simple single-location business with straightforward needs

Bottom line:  NetSuite is the right choice when your business complexity has outgrown the tools you started with — but it’s an enterprise investment, not a quick setup.

Users Reviews

Write a review

Leave a review, help others get it right the first time.

8 Reviews

HB

Henry B

51-200 employeesUsed for: 1-2 years

Glad I made the switch

I've been using a different accounting software for 5 years now, however, my business partners recommended NetSuite. After thorough research and talk a lot with the customer support team (great service btw!) I made the switch, and have been happy since.

Like:
  • My business is able to comply better and effectively with all accounting standards now
BF

Brad F

51-200 employeesUsed for: 1-2 years

Excellent ERP!

It's cloud based and because of this, I can rely solely on this software and not have to outsource help.

Like:
  • Mutli language options, reasonably priced, grows with your company - just to name a few.
Dislike:
  • Can take a few months or more to completely implement into your business but once you do, it's worth it
BW

Brandon W

11-50 employeesUsed for: 2+ years

Impressed for years now!

I love being able to customize reports. NetSuite's cloud-based ability has brought my business to the next level, adding great flexibility and accessibility. I've been using this for years now. Been telling all my friends that they need to implement this

Dislike:
  • Can get expensive.
MC

Miranda C

11-50 employeesUsed for: 6-12 months

Real time metrics are my favorite!

The insight my business has gained because of this software goes unparalleled. The dashboard offers a positive experience. Everyone's performance is immensely improved since introducing NetSuite into the company.

Like:
  • The customization is incredible. When multiple staff members are working from other locations, all they need is internet. Easy and streamlined!
Dislike:
  • Nothing bad to say. Overall, I recommend!
CJ

Cameron J

1-10 employeesUsed for: 1-2 years

Love it, just be patient!

Ensure that this software is implemented correctly and efficiently. If so, you'll be smooth sailing from here and out.

Like:
  • Plethora of features available. Can be cloud-based if needed, which is great for working from home.
FL

Fredrick L

11-50 employeesUsed for: 1-2 years

Robust but pricy

This accounting solution entails extensive billing management, financial planning, and great reporting. The package in whole is pretty dimensional, thus it's not for those looking for a very simple and easy system. I personally prefer the dynamic aspect o

CB

Charlie B

1-10 employeesUsed for: 1-2 years

Reputable product from a reputable company

All in one solution which I can imagine would work great with many businesses across the board - specifically the ones on a larger scale or are planning to grow rapidly.

Like:
  • Love the real time data and the email feature.
Dislike:
  • Outdated UI, could be improved
JB

Jerome B

11-50 employeesUsed for: 6-12 months

Amazing Product

Overall, super satisfied with NetSuite's service. This software is intensive but comprehensible. New features are constantly being released. I feel that this software truly grows with your business. Five stars all around from me and my staff.